Banner DF-G1-PR-Q7 Instrucciones de operaciones Pagina 52

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 253
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 51
4 – Electrical Installation
DPN 402197 © TSS (International) Ltd Page 1 of 18
4 ELECTRICAL INSTALLATION
This section of the Manual explains how to connect the SDC and the sub-sea compo-
nents of the standard 350 System. You should attempt the electrical installation only
after you have followed the instructions in Section 3 to install the sub-assemblies of
the 350 System.
Also included in this section are detailed instructions that tell you how to change the
communication method used between the SDC and the SEP.
The standard 350 System uses 2-wire current-loop communications. To select an alter-
native communication method you must change the settings of links inside the SEP
and the external switch on the SDC Converter Card.
If you need to change the communication method you must make the necessary link
adjustments inside the SEP before you mount it onto the ROV.
4.1 Sub-sea Components Page 2
To gain the best performance from the 350 System, you must interconnect the sub-
sea components of the System properly. This sub-section explains how to do this.
Refer to Appendix B for instructions to connect the System as part of a Dualtrack
installation.
4.2 Surface Display Computer Page 11
The SDC includes the DeepView for Windows™ graphical display and logging soft-
ware that allows you to configure and control the 350 System.
This sub-section explains the mandatory and optional connections to the SDC. It also
explains how to change the communication method between the surface and the sub-
sea components of the 350 System.
Vista de pagina 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 252 253

Comentarios a estos manuales

Sin comentarios