
350 Cable Survey System
DPN 402197 © TSS (International) Ltd Page 4 of 14
2.2 UNPACKING AND INSPECTION
TSS performs a series of careful examinations and tests on the electrical function and
mechanical integrity of the 350 System during manufacture and before dispatch. Spe-
cial shock protecting cases safeguard the System during transit so that it should
arrive without damage or defect.
Retain the original transit cases so that you may use them if you must transport the 350
System for any reason. You will invalidate the warranty if you use improper packing
during transportation.
As soon as possible after you have received the 350 System, check all items against
the shipping documents. Perform a careful visual examination of all sub-assemblies
and inspect them for any damage that might have occurred during transportation.
Notify TSS (International) Ltd immediately if there are parts or sub-assemblies miss-
ing from your shipment. If you see any damage to the System, file a claim with the
insurers and inform TSS. The title page of this Manual lists the contact details for TSS
(International) Ltd. TSS also operates a 24-hour emergency telephone support line
managed by trained and experienced TSS engineers.
To avoid loss or damage to any components of the System, store all sub-assemblies
safely in their transit cases until you need to install them. Obey the environmental lim-
its for storage listed in Section 8 for all sub-assemblies.
Comentarios a estos manuales