Banner DF-G1-PR-Q7 Instrucciones de operaciones Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 253
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
350 Cable Survey System
DPN 402197 © TSS (International) Ltd Page 2 of 14
2.1 SCOPE OF DELIVERY
The 350 System includes various sub-assemblies that you must interconnect properly
before the System will work.
Figure 2–1 shows a typical stand-alone configuration for the 350 System that has the
SDC installed on a surface vessel and the sub-sea components mounted on the
ROV. Table 2–1 identifies the individual components of the installation.
Optionally, you may use the 350 System as part of a Dualtrack installation. In this
mode, a single SDC controls the operation of the 350 Cable Survey System when its
sub-sea components are connected to a TSS 440 Pipe and Cable Survey System.
Refer to Appendix B.2 for instructions to connect and configure the 350 System within
a Dualtrack installation.
Figure 2–1: Components of the 350 Cable Survey System
Sub-sections 2.3 and 2.4 below provide detailed descriptions of the surface and the
sub-sea components of the 350 System
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 252 253

Comentarios a estos manuales

Sin comentarios